Projects
Kandava
Construction of connecting pipe section, connection of new clients, by joining independent heating district to the main heating network.
About the project
- Client SIA «Kandavas komunālie pakalpojumi»
- Construction by SIA «Amatnieks»
- Investment 0,3 million EUR
- Project co-financed by EU structural funds.
Technical specification
- New pipe system length 780 m
- 1252 meters of FiberFlex pre-insulated, flexible thermoplastic pipes
- 308 meters of Logstor pre-insulated metal pipes
- Pipe size range DN 50 up to DN 140 mm
- Pipe system max working temperature Tmax= 115 0C
- Pipe system max working pressure Pmax= 10 bar.
Construction finished July 2020







